QR code per bundleLot · piece mark · quality certificates
Pre-shipment inspection · PSI
Quality control of goods
Packing and packaging inspection
Weight and volume verification
Sealing and cargo security
Technical receipt on site
Asset management
Zoned laydown yard
Tower erected with no shortages
Hot-dip galvanized coating
Eta η70 DPN100% Zn
Zeta ζ179 DPN94% Zn · 6% Fe
Delta δ244 DPN90% Zn · 10% Fe
Gamma Γ250 DPN75% Zn · 25% Fe
Base steel · ASTM A572 Gr. 50159 DPNFe98C0.20Mn1.35Si0.40P0.03S0.03
Prototype load test
Full-scale test · IEC 60652
Transverse
Longitudinal
Vertical
0 %
of design load
Prototype approved
Documents approved
Ocean transit
Customs
Departure (ETD)
Arrival (ETA)
Delivery to site
Supply control for infrastructure projects
We ensure quality and efficiency in every supply: third-party inspection, QA/QC, traceability and logistics of materials and equipment for transmission lines, substations, renewable energy, mining and infrastructure.
+480,000 MTcontrolled
10years
ISO 9001:2015
Scroll to follow the process
Stage 1 of 8 CQM-D
Tower engineering and design
Tower design and review for multiple sectors using BIM methodology (3D modeling, silhouettes and TOWER models) and development of technical specifications.
500 kV AC and ±600 kV HVDC lines
Stage 2 of 8 CQM-D
Design validation and prototype testing
Approval of shop drawings and bills of materials (BOM), and supervision of tower prototype load tests before series production.
474 prototypes supervised and 9,000+ drawings approved
Stage 3 of 8 CQM-F
Factory inspection and QA/QC
Third-party inspection at the plant under the inspection and test plan (ITP): materials, galvanizing, type tests and FAT, plus production follow-up (expediting).
Hot-dip galvanizing to ASTM A123 and ISO 1461
Stage 4 of 8 CQM-L
Material traceability and marking
Every bundle is identified with a QR code linked to its lot, piece mark, container and mill test certificates (MTC), with photo evidence on the CQM platform.
Piece-by-piece traceability, from factory to site
Stage 5 of 8 CQM-L
Pre-shipment inspection (PSI)
Inspection of loading, stowage and export documents before each container is sealed.
18,000+ containers handled
Stage 6 of 8 CQM-L
International logistics and shipment tracking
Document management and shipping approvals (B/L, certificates of origin, customs clearance) and real-time factory-to-site tracking: shipping line, customs and inland transport.
Operations in 17+ countries
Stage 7 of 8 CQM-S
Site receipt and laydown yard management
Technical receipt, counting and physical verification; zoned yards, inventory control and asset management with barcodes or RFID.
Inventory 100% visible to project management
Stage 8 of 8 CQM-S
Construction control and follow-up
Deliveries by erection front (kitting), shortage control and supply progress through to the erected tower.
CQM's own platform connects the manufacturer, inspector, shipping line, customs, client and contractor. What is recorded in the field on a phone is reviewed on the web in real time.
Inspection with evidence
The inspector records photos and data for each FAT from a phone; the reviewer approves it on the web and every status change is logged.
Manufacturing control
In-plant follow-up of progress by lot, material tests and galvanizing before each dispatch is released.
QR code traceability
Each bundle is scanned and linked to its piece mark, packing list and quality certificates.
Verified loading
Photos of the empty and loaded container, bundle count and net weight before sealing.
Shipments and documents
Bills of lading (B/L), routes and estimated arrival dates on a live map.
Data for decisions
Milestones, inspections, documents and tonnage per project, with delay alerts for management.
app.consorcioqutubminar.com
CWO project · 500 kV lineQA/QC reviewer
Tower prototype inspectionFAT
Related records
Total 874Pending 6Approved 868
SDHTL tower typeSubtype: basic bodyApproved
SDHTL tower typeSubtype: leg extensionApproved
SDLTL tower typeSubtype: basic bodyApproved
Inspection evidence
1/42/43/44/4
Tower typeSDLTLSubtypeBasic bodyCommentsGeneral assembly, ladders and platforms
More than 48 contracts in transmission lines, substations and renewable energy. Each route links a factory with its site.
Select a destination on the globe to see the project.
Route
Controlled material
Prototypes
+480,000tof controlled material
+48contracts
17+countries
5continents
8manufacturing countries
In the field, at the factory and in the yard
Prototype tests, erection and material control recorded by our teams.
FieldFactoryYard
What doesn't comply stays at the factory
We inspect by lot: if the sample fails, the whole lot stays at the factory.
5of186lots held
ISO 2859-1 sampling · inspection level II · AQL 1.0 · per each project's ITP
Shortages start on four fronts. CQM closes each one.
1.054%shortages, industry average
1.054%0.03%
shortages, industry averageshortages with CQM control
Select a front to see how CQM closes it.
We reconcile the BOM, packing list, certificates and marking before the container is sealed.We control revisions, quantities and balances of each order against the bill of materials.We supervise stowage, seals and shipping documents all the way to the site yard.We release only compliant lots and trace each bundle by QR code until it is received.
Consorcio
Qutub
Minar
Consorcio Qutub Minar
Construction Quality Management
Cargo Quality Management
Container Quality Management
Component Quality Management
Contractor Quality Management
Continuous Quality Monitoring
Construction Quantity Measurement
Consorcio Qutub Minar
Your international partner for securing industrial supplies
Consorcio Qutub Minar is an engineering, technical inspection and supply logistics company. We coordinate and supervise every stage of procurement (design, manufacturing, testing, dispatch, tracking and receipt) so that every material reaches the site compliant, complete and on time.
Our experience comes from large energy projects and applies to any sector that depends on critical supplies.
Consorcio Qutub Minar S.A.S.ColombiaCajicá
Qutub Minar Inc.United StatesMiami
ISO 9001:2015Certified quality management system for supply supervision and logistics control
Let's talk about yournext supply
Which stages do you need to control?
Select the stages in the chain. It's the only required step.
Project details
Your order is ready to send
Choose a channel; you can use more than one.For WhatsApp, scan the order code with your phone.